HS2 begins M6 viaduct slide
This post was originally published on this site View and embed timelapse and drone footage from this weekend showing engineers sliding the first section of…
This post was originally published on this site View and embed timelapse and drone footage from this weekend showing engineers sliding the first section of…
This post was originally published on this site Third of four tunnel boring machines excavating HS2’s 8.4-mile long Northolt Tunnel breaks through All tunnelling will…
This post was originally published on this site The first platforms that will be used by passengers travelling on HS2 are being built Each platform…
This post was originally published on this site
This post was originally published on this site
This post was originally published on this site Striking images and video show the huge cutterhead being lifted to the skies The 125-metre-long machine is…
This post was originally published on this site
This post was originally published on this site Ballast from decommissioned railway sidings in West London donated to heritage railway Sidings were used to bring…
This post was originally published on this site HS2 passes a significant employment milestone with over 5,000 unemployed people starting new careers on the project…
This post was originally published on this site HS2 lifts Tunnel Boring Machine (TBM) ‘Caroline’ from below ground at the Green Park Way site in Greenford,…