HS2 – new images showing construction progress of Britain’s longest rail bridge
This post was originally published on this site Building work continues after Colne Valley viaduct passes halfway point in Autumn 2023
This post was originally published on this site Building work continues after Colne Valley viaduct passes halfway point in Autumn 2023
This post was originally published on this site Giant step forward for new high-speed line with £5bn of contracts to build HS2’s crucial rail infrastructure…
This post was originally published on this site Milestone in North Warwickshire as HS2 completes first 39 metre span of the 472 metre River Tame…
This post was originally published on this site Breakthrough on HS2’s longest tunnel expected early next year as giant tunnelling machines 90% of the way…
This post was originally published on this site Work to prepare the ground for HS2’s new Network Integrated Control Centre (NICC) and train maintenance depot…
This post was originally published on this site The first freight services have departed Hartlepool bound for HS2’s London Logistics Hub HS2’s tunnel segment manufacturer,…
This post was originally published on this site Four winning SMEs go forward to development phase Competition marks preparation for HS2 programme transition to rail…
This post was originally published on this site Northants viaduct becomes second HS2 viaduct to have every major element manufactured off-site, saving carbon and simplifying…
This post was originally published on this site Timelapse footage captures huge cutterhead being lifted into place at HS2’s Bromford Tunnel launch site in North Warwickshire…
This post was originally published on this site